Cost-Effective Solution to CCRD Cable Breakage.
Paddle Feeder (PF) is vital equipment for Coal Handling Plant in any thermal power plant, utilized for unloading of coal at power plants. These machines can be considered as gateways of coal in any power plant. The major problems occurrence is the machines operates in underground tunnels with vary less space, the CCRD cable breakage was major reason for down time of these machines, hence Paddle feeders are installed in underground tunnel of length 400-600 meters length in highly dust, coal, humid environment. The Wireless System for Paddle Feeder Machines System is a scalable and customized and Rapid Deployment and are Proven option for cost effective replacement of CCRD cables.
Call 020- 25467179 /
+91 8007602020
sales@sheetalwireless.com
admin@sheetalwireless.com
support@sheetalwireless.com
Head Office – Sheshadri Society, Opp. Kotak Bank, Rambaug Colony, Paud Road, Pune – 411038, Maharashtra, INDIA
Regional Offices – Mumbai | Kolkata | Bengaluru | Delhi | Kochi | Jamshedpur | Chennai | Bhopal | Ranchi | Ajmer | Hyderabad
Copyright © 2024 All Rights Reserved | Privacy | Designed By – Optimist Brand Design LLP